Lompat ke isi

Bendungan Bakun: Perbedaan antara revisi

Dari Wikipedia bahasa Indonesia, ensiklopedia bebas
Konten dihapus Konten ditambahkan
Rachmat-bot (bicara | kontrib)
k cosmetic changes
k Robot: Perubahan kosmetika
Baris 18: Baris 18:
* [http://www.atimes.com/atimes/Southeast_Asia/HA25Ae01.html Dirty dam draws dirty smelters] ''Asian Times Online.'' Extracted January 26, 2006.
* [http://www.atimes.com/atimes/Southeast_Asia/HA25Ae01.html Dirty dam draws dirty smelters] ''Asian Times Online.'' Extracted January 26, 2006.
* [http://biz.thestar.com.my/news/story.asp?file=/2009/11/16/business/5094242&sec=business Article of Bakun Project with map of Powergrid of Malaysia]
* [http://biz.thestar.com.my/news/story.asp?file=/2009/11/16/business/5094242&sec=business Article of Bakun Project with map of Powergrid of Malaysia]
{{bangunan-stub}}


[[Kategori:Bendungan di Malaysia]]
[[Kategori:Bendungan di Malaysia]]


{{bangunan-stub}}

Revisi per 2 September 2016 09.11

Perkembangan pembangunan bendungan pada Juni 2009.

Bendungan Bakun adalah bendungan hidroelektrik yang sedang dibangun di Sungai Balui, Sarawak, Malaysia.[1] Bendungan ini akan menghasilkan 2.400 megawatt (MW) listrik setelah selesai dibangun.

Tujuan pembangunan bendungan ini adalah untuk memenuhi kebutuhan listrik, namun permintaan ini kebanyakan berasal dari Semenanjung Malaysia, dan bukan Malaysia Timur, tempat berdirinya bendungan ini. Gagasan awalnya adalah mengalirkan 30% listrik ke Malaysia Timur, dan sisanya ke Semenanjung.

Pada masa depan, direncanakan bendungan ini akan dihubungkan dengan jaringan listrik trans-Borneo, sehingga dapat memasok listrik ke Sarawak, Sabah, Brunei, dan Kalimantan (Indonesia).

Catatan kaki

  1. ^ "Bakun National Hydroelectric Project Milestones". Malaysia-China Hydro Joint Venture. 2004. Diakses tanggal 2007-08-07. 

Pranala luar